Open Trench & PVC Conduit Installation

35 LF Open Trench & Conduit Installation | Devco

35 LF Open Trench & 3” PVC Conduit Installation

Devco Development & Engineering completed a 35 linear foot open trench project for the installation of one (1) 3-inch Schedule 40 PVC conduit. The project included saw cutting, trench excavation, conduit placement, slurry backfill, asphalt restoration, and site cleanup.

Saw Cutting & Trench Excavation

  • Saw cut the designated trench path to maintain clean and controlled pavement edges.
  • Excavated approximately 35 linear feet of trench to required depth and width.
  • Provided trench plating as needed to maintain site safety during construction.

Conduit Installation

  • Installed one (1) 3-inch Schedule 40 PVC conduit within the trench alignment.
  • Ensured proper placement and alignment prior to backfill operations.

Backfill & Material Management

  • Slurry backfilled the trench with approved 100-E-100 material.
  • Hauled away and properly disposed of all excavated spoils.

Asphalt Restoration

  • Repaved trench area approximately 3 feet wide by 35 feet long.
  • No grind and cap required per project specifications.

Project Duration & Coordination

  • Estimated project duration: four (4) working days.
  • Traffic control provided by others.

Project Outcome

The project was completed efficiently and in accordance with specifications. Devco maintained safe trench operations, proper conduit installation, and clean asphalt restoration, delivering a professional and durable underground installation.