Devco Development & Engineering completed a 1,750 linear foot directional boring project for the installation of a 14-inch customer-supplied steel sleeve. The project included full utility coordination, potholing verification, bore pit excavation, reaming operations, pullback, welding support, drilling fluid management, and restoration.
The installation was completed safely and efficiently, with accurate utility verification, controlled drilling fluid management, and precise steel sleeve placement. Devco maintained a clean and organized jobsite throughout all phases of work.