Description
Horizontal Directional Drilling (HDD) in Somerton by DEVCO Development and Engineering
DEVCO Development and Engineering provides Horizontal Directional Drilling (HDD) for underground utilities in Somerton and throughout Yuma County. We work with general contractors, public agencies, utilities, and private owners to install pipelines and conduits under roads, drives, and sensitive areas without open trenching. Our HDD crews plan each bore for existing utilities, soil conditions, and traffic safety.
What Horizontal Directional Drilling Actually Does
Horizontal Directional Drilling is a trenchless method used to install pipe or conduit along a set path underground. Instead of cutting open a road or field, we drill from one pit to another, then pull the utility line back through the hole.
The basic steps are simple but very exact:
- Drill a guided pilot bore along the designed route and depth.
- Enlarge the bore with reamers to match pipe size and soil type.
- Pull in the product pipe or conduit while monitoring line and grade.
This approach is ideal for water, sewer, storm, power, gas, fiber, and other utility crossings where you can’t, or shouldn’t, open cut.
Common HDD and Roadway Crossing Needs in Somerton
Most calls we get for Horizontal Directional Drilling (HDD) Somerton involve getting utilities from one side of an obstacle to the other without tearing everything up.
Typical situations include:
- Roadway directional drilling Somerton projects to cross city streets, county roads, and highways.
- Crossing under driveways, parking lots, and business entrances that must stay open.
- Installing lines below irrigation ditches, drainage channels, or landscaped areas.
- Adding new services in built-out neighborhoods with lots of existing utilities.
- Rural runs where long, continuous pipe sections are preferred over multiple open trenches.
Every site is different—traffic, existing utilities, available work space, and soil all affect how we design the bore and choose tooling.
Why Owners and Agencies Choose HDD
Compared to traditional trenching, HDD usually means less surface disruption and a cleaner, faster restoration. Roads often stay open with only shoulder work and small entry/exit pits. That’s a big deal for busy Somerton routes or access roads serving farms and packing houses.
Other practical advantages:
- Reduced risk of pavement settlement because the road base isn’t disturbed end to end.
- Fewer conflicts with trees, landscaping, and existing site improvements.
- Safer work zones with smaller footprints around traffic.
- Ability to keep utilities deeper and better protected.
What You Should Know Before We Drill
A little preparation on your side makes HDD smoother and more predictable. Helpful items include:
- Basic plan and profile showing start and end points, depths, and pipe sizes.
- Utility locate information and any known conflicts along the path.
- Site access details for rigs, support trucks, and mud management.
- Any agency requirements for traffic control or work hours.
If you’re still early in design, that’s fine—we’re used to helping refine alignments and discussing what’s realistic for HDD versus open cut.
Experienced vs. Inexperienced HDD Contractors
Directional drilling looks straightforward from the outside, but the difference between a good bore and a problem job is planning and field judgment. An experienced crew:
- Studies existing utilities and adjusts entry/exit angles accordingly.
- Uses the right drilling fluids and reamers for the soil conditions on that site.
- Tracks and records the bore path so you know where your line actually is.
- Has clear procedures for avoiding and responding to inadvertent returns (frac-outs).
That’s the level of care we bring to our underground utility work across Yuma County.
Frequently Asked Questions
Is HDD always cheaper than open trench?
Not always. HDD usually costs more per foot than simple trenching, but once you factor in traffic control, paving, and restoration, it often wins for road and driveway crossings. For a deeper look at factors that affect pricing, see our overview of directional drilling cost considerations for HDD projects.
How long does a typical HDD crossing take?
Small street or driveway crossings can often be drilled and piped in a day once permits and locates are complete. Longer or larger-diameter bores may take several days, especially if there are tight clearances with existing utilities or complex traffic setups.
Work With a Qualified DVBE HDD Contractor
DEVCO Development and Engineering is a DVBE and SDVOSB contractor, also certified as PDBE, SB-Micro, and SB-PW. Those classifications reflect a professional, well-documented operation—important for public work and private projects alike.
If you
Listing Details
-
CategoryHorizontal Directional Drilling (HDD)
-
CountyYuma County
-
CitySomerton
-
Contact Emailinfo@devco-inc.com
-
Phone Number(951) 221-3633
-
ServicesHorizontal Directional Drilling (HDD) Somerton, Roadway directional drilling Somerton